2. Groundworks

Installation of foundation sub base, foundation works and drainage.

Trench digging

The majority of groundworks were completed prior to the erection of the timber frame but there were a few items left over that I decided to undertake myself. These were laying the pipework for surface water drainage and also a trench for a new water connection, phone connection and power and data to lighting [...]

By |2020-09-10T11:04:20+01:00May 23rd, 2017|2. Groundworks, Self build timeline|

Passive slab foundation

Foundation for a Passive House A passive slab foundation is a raft that is fully insulated from contact with the ground below eliminating any thermal bridging. Insulation forms the shuttering for a concrete pour, and layering of the insulation allows a ring beam to be formed around the perimeter and thickening under load bearing [...]

By |2022-05-12T12:36:44+01:00May 24th, 2016|2. Groundworks, Self build timeline|